Videos

Robbins EPBs in Action: Chengdu Metro

Soft clay soil, an array of boulders, and sharp turns have each added an extra layer of difficulty on the Chengdu Metro Line 2 project. Custom-engineered with active articulation systems, the two Robbins 6.3m EPBs have been carving their paths at speeds up to 180 meters per week.