Events
Over 1,200 Meters per Month in Himalayan Geology
With Brad Grothen, Missy Isaman
Date: August 13, 2020
Time: 8 AM PDT / 11 AM EDT / 3 PM GMT
Duration: 30 Minutes
Time: 8 AM PDT / 11 AM EDT / 3 PM GMT
Duration: 30 Minutes
Nepal’s first TBM-driven tunnel was a success by any standard: The Robbins Double Shield machine bored up to 1,200 meters a month and finished the Bheri Babai Diversion Multipurpose Project nearly a year early. But how were crews able to bore so quickly? And what made the contractor and owner ultimately decide to use a TBM for the first time?
Watch our complimentary 30-minute webinar with Brad Grothen P.E., Robbins Technical Director, and Missy Isaman P.E., Robbins Project Engineer, as we discuss the challenges, lessons learned, and recommendations for future tunnels in mountainous geology.
Watch the Recording
Presenters
Brad Grothen
Vice President-EngineeringMissy Isaman
Project Engineer