Onsite First Time Assembly, 25 Times Over
Robbins developed Onsite First Time Assembly (OFTA), a way of building TBMs on location, in 2006. The method has been shown to save months on the delivery schedule and millions in USD. By 2017, OFTA had been used to build every type of TBM Robbins offers, on 25 projects worldwide.
Recent Posts
- Twin Robbins EPBs make milestones near Taj Mahal
- Long Haul TBM: Use of a Rebuilt Main Beam Machine at the DigIndy Tunnel System in Indianapolis, IN
- Evaluating TBM Design and Performance, 30 Years Apart: The Lesotho Highlands Water Tunnel, Phase 1 and Phase 2
- Overcoming Mountainous Geology at Nepal's Sunkoshi Marin Project
- Swift Robbins TBM breaks through 11 Months Early