White Papers
TBM Excavation in Himalayan Geology: Over 1,200 Meters per Month at the Bheri Babai Diversion Multipurpose Project
A Double Shield TBM achieved in 17 months what was projected to have taken 12 years with Drill & Blast: The 12.2 km long Bheri Babai Diversion Multipurpose Project (BBDMP). Bored in Himalayan geology including sandstone, mudstone, and conglomerate, the excavation was able to achieve over 1,200 m advance per month on multiple occasions. Crews achieved this while traversing a fault zone and getting through one section that required a bypass tunnel constructed in just five days. The success of this tunnel is not only in breaking through a historically difficult mountain range, but also in changing the notion, to the people of Nepal, that drill and blast is the way to excavate mountainous rock tunnels.
Recent Posts
- Long Haul TBM: Use of a Rebuilt Main Beam Machine at the DigIndy Tunnel System in Indianapolis, IN
- Evaluating TBM Design and Performance, 30 Years Apart: The Lesotho Highlands Water Tunnel, Phase 1 and Phase 2
- Use of a Tunnel Boring Machine on Nepal’s First and Second TBM-Driven Tunnels
- Record-Setting Large Diameter Mixed Ground Tunneling in Turkey: The Eşme-Salihli Railway Tunnel
- Lessons Learned During Excavation of the Incredibly Challenging Yin Han Ji Wei Water Diversion Tunnel