Videos

Robbins Crossover TBM: Breaking Records at TEP II

At Mexico City’s Túnel Emisor Poniente II (TEP II), a Robbins Crossover (XRE) TBM has excavated at record-breaking speeds through varying geology – even breaking a national record of 57 meters in a single day. Watch how the 8.7 m diameter Robbins Crossover machine will supplement an existing and overtaxed wastewater line built in the 1970’s.