Videos
Robbins Hard Rock TBMs: Return to Norway
Find out about Norway’s Røssåga Hydroelectric Project, the first TBM to be used in the country in more than 20 years. Watch in-depth site interviews about machine performance in incredibly hard, abrasive rock, remote site conditions, and the future of TBM use in Norway.
- Overcoming Mountainous Geology at Nepal's Sunkoshi Marin Project
- Unprecedented Diameter Change: The Mill Creek Tunnel
- Mine Development Machine: Successful Rectangular Rock Bore in Fresnillo, Mexico
- Encountering Caverns in France: TBM Tunneling in Karst Conditions
- 48 Fault Zones and 26 Bar Pressure: Boring Turkey's Gerede Water Transmission Tunnel