EPB Excavation of Less Than Five Meters Below the Historic Structure of Chandpole Gate on the Jaipur Metro Project
The tunnels excavated by Continental Engineering Corporation (CEC) for the underground section of the Jaipur Metro project faced the usual challenges posed by metro projects worldwide, including small site footprints, and the associated problems regarding segment and muck storage space, etc. These challenges were, however, relatively straightforward when compared to the challenges faced by the tunneling operations. The Earth Pressure Balance (EPB) TBMs were required to bore under extremely low overburden, alongside and beneath several culturally sensitive historic structures. The age of these structures and their construction methods/materials were of great concern when considering the possible consequences of tunneling-induced ground settlement and vibrations. This paper will describe the measures taken regarding TBM operations and surface monitoring to ensure that these historic structures suffered no adverse effects due to tunneling.
- Long Haul TBM: Use of a Rebuilt Main Beam Machine at the DigIndy Tunnel System in Indianapolis, IN
- Evaluating TBM Design and Performance, 30 Years Apart: The Lesotho Highlands Water Tunnel, Phase 1 and Phase 2
- Use of a Tunnel Boring Machine on Nepal’s First and Second TBM-Driven Tunnels
- Record-Setting Large Diameter Mixed Ground Tunneling in Turkey: The Eşme-Salihli Railway Tunnel
- Lessons Learned During Excavation of the Incredibly Challenging Yin Han Ji Wei Water Diversion Tunnel