Next Generation Hybrid: The Crossover TBM
In 2015, the breakthrough of Robbins’ first Crossover TBM took place at Australia’s Grosvenor Coal Mine. The latest generation hybrid machine, made to cross between geologies that would normally require multiple TBMs, excavated variable ground 14 times faster than a roadheader. Since that initial project, dozens of Crossover machines have been used worldwide.
- Twin Robbins EPBs make milestones near Taj Mahal
- Long Haul TBM: Use of a Rebuilt Main Beam Machine at the DigIndy Tunnel System in Indianapolis, IN
- Evaluating TBM Design and Performance, 30 Years Apart: The Lesotho Highlands Water Tunnel, Phase 1 and Phase 2
- Overcoming Mountainous Geology at Nepal's Sunkoshi Marin Project
- Swift Robbins TBM breaks through 11 Months Early