白皮书论文

Long Haul TBM: Use of a Rebuilt Main Beam Machine at the DigIndy Tunnel System in Indianapolis, IN

TBMs can last for decades and be rebuilt project after project with proper maintenance. How successful can rebuilt TBMs be? At the DigIndy Tunnel System in Indianapolis, Indiana, USA, a rebuilt TBM was used to great effect. The 6.2 m diameter Main Beam, originally manufactured in 1980, bored 40+ km of tunnels and set three world records in its size class of 6 to 7 m, including a best month of 1,754 m. In this paper, the authors analyze the TBM rebuild, performance and lessons learned to make recommendations for future projects seeking to use rebuilt TBMs over long distances.

 

  Download File